Stabilisation

Sulpher condenser  

Challenge / question

A client is looking for a special waste heat boiler. He would like to use the heat of the combustion gases at a temperature of 1.200°C. The heat must be absorbed in two steps. The first step is at a high level where intense cooling of the tubes must be guaranteed. The inlet of the tubes must also be resistant to the high temperatures. In the second step, the hot gasses cool down further to a lower level where the temperatures on the tube side are less critical.
 
p1010051  

Our solution

To absorb the heat at a high level in the first step, we use a thermosiphon reboiler which guarantees extreme cooling of the tubes. The clever use of a separator drum placed above the steamer guarantees a homogenous flow and temperature around the tubes via several risers and downcomers. The cooling down of the hot flow in the second step is done by using a standard kettle reboiler. The conditioned internal recirculation of this kettle provides optimal cooling of the hot gasflow.

 
Sitemap
 
Hide
 

Contact

The Netherlands

Russia

Czech Republic

Main office
Stationsweg 22 P.O. Box 92 Phone: +31 33 24 72 500
3862 CG Nijkerk 3860 AB Nijkerk Fax: +31 33 24 52 338
The Netherlands The Netherlands Email: info@bronswerk.com
Smolenskaya Square 3 Phone: +7 495 775 1060
121099 Moscow Fax: +7 495 775 1061
Russia Email: info@bronswerk.ru
Děčínská 288 P.O. Box 14 Phone: +420 412 590 511
407 22 Benešov nad Ploučnicí 407 22 Benešov nad Ploučnicí Fax: +420 412 586 340
Czech Republic Czech Republic Email: info@bronswerk.cz
Service & Maintenance
Seggelant-Noord 5D Phone: +31 18 17 45 500
3237MG Vierpolders Email: service@bronswerk.com
The Netherlands
Dutch contact map
Czech contact map
Russisch contact map
© Bronswerk   Privacy statement   Terms & Conditions   Disclaimer
website by Fenêtre + gaudi
2